39-704 Bachmann BR MK2F BSO Brake Second Open Scotrail Saltire
Bachmann
Rails of Sheffield\n--Learn more about us \n--Shipping \n--Returns \n--Feedback \n--Contact Us \n--Payment Methods\nBachmann 39-704 39-704 BR Mk2F BSO Brake Second Open ScotRail Saltire 9527\n\nBritish Rail's second generation of Standard Coach design is known as the Mark 2. Design and construction followed on from the universal and ubiquitous Mk1 family of coaching stock, with the prototype example built in 1963. Series production continued until 1975 at Derby Carriage Works. They were of steel construction, and of a more monocoque design than the Mk1, which added to their safety and integrity in event of collision or mishap. \n\nAs passenger expectations and railway operations had moved on since the vast Mk1 range was conceived, and because there was still much life left in the Mk1s by the mid-sixties, a much reduced number of vehicle types were built. The basic Mk2 types included First and Second class accommodation, with corridors and compartments only available to Fird
Compare prices (3 shops)
| shop | Price | Action |
|---|---|---|
|
|
48,95 GBP | Go to shop |
|
|
54,95 GBP | Go to shop |
|
|
60,00 GBP | Go to shop |
